astonrail_handbook:astonrail_project:wg3
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
astonrail_handbook:astonrail_project:wg3 [2023/05/24 14:21] – anne-katrin_o | astonrail_handbook:astonrail_project:wg3 [2023/07/04 10:53] (current) – anne-katrin_o | ||
---|---|---|---|
Line 31: | Line 31: | ||
^European tactical | Reliability and asset management | Logistics | Costing | Legal | Safety and security | | ^European tactical | Reliability and asset management | Logistics | Costing | Legal | Safety and security | | ||
^European operational | Reliability and asset management | Signalling | Modelling and data | Legal | Safety and security | | ^European operational | Reliability and asset management | Signalling | Modelling and data | Legal | Safety and security | | ||
- | ^Germany | + | ^Germany | Costing | Operation | Modelling and data | Legal | Safety and security | |
A systematic study of professional sectors different than Railways has also been performed at the partner universities, | A systematic study of professional sectors different than Railways has also been performed at the partner universities, |
astonrail_handbook/astonrail_project/wg3.1684930892.txt.gz · Last modified: 2023/05/24 14:21 by anne-katrin_o