User Tools

Site Tools


astonrail_handbook:astonrail_project:wg3

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
astonrail_handbook:astonrail_project:wg3 [2023/05/24 14:21] anne-katrin_oastonrail_handbook:astonrail_project:wg3 [2023/07/04 10:53] (current) anne-katrin_o
Line 31: Line 31:
 ^European tactical | Reliability and asset management | Logistics | Costing | Legal | Safety and security | ^European tactical | Reliability and asset management | Logistics | Costing | Legal | Safety and security |
 ^European operational | Reliability and asset management | Signalling | Modelling and data | Legal | Safety and security | ^European operational | Reliability and asset management | Signalling | Modelling and data | Legal | Safety and security |
-^Germany + Austria | Costing | Operation | Modelling and data | Legal | Safety and security |+^Germany | Costing | Operation | Modelling and data | Legal | Safety and security |
  
 A systematic study of professional sectors different than Railways has also been performed at the partner universities, generating a very powerful analysis of academic practices in Europe for different transport sectors.  A systematic study of professional sectors different than Railways has also been performed at the partner universities, generating a very powerful analysis of academic practices in Europe for different transport sectors. 
astonrail_handbook/astonrail_project/wg3.1684930892.txt.gz · Last modified: 2023/05/24 14:21 by anne-katrin_o