astonrail_handbook:astonrail_project:wg3
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| astonrail_handbook:astonrail_project:wg3 [2023/05/24 12:21] – anne-katrin_o | astonrail_handbook:astonrail_project:wg3 [2023/07/04 08:53] (current) – anne-katrin_o | ||
|---|---|---|---|
| Line 31: | Line 31: | ||
| ^European tactical | Reliability and asset management | Logistics | Costing | Legal | Safety and security | | ^European tactical | Reliability and asset management | Logistics | Costing | Legal | Safety and security | | ||
| ^European operational | Reliability and asset management | Signalling | Modelling and data | Legal | Safety and security | | ^European operational | Reliability and asset management | Signalling | Modelling and data | Legal | Safety and security | | ||
| - | ^Germany | + | ^Germany | Costing | Operation | Modelling and data | Legal | Safety and security | |
| A systematic study of professional sectors different than Railways has also been performed at the partner universities, | A systematic study of professional sectors different than Railways has also been performed at the partner universities, | ||
astonrail_handbook/astonrail_project/wg3.1684930892.txt.gz · Last modified: 2023/05/24 12:21 by anne-katrin_o